Answer: 10 - 12 hours Explanation: I'm going to go to the middle here. I have a lot of basic install that can be done in 2-4 hours but the high tech requires mapping programming and more it takes a couple of trips. |
SHADY LAKE HANDYMAN |
Answer: 4 - 6 hours Explanation: Depends on the job |
Access Pressurewash |
Answer: Not sure Explanation: Our projects range from 10,000 lights to over 1 Million lights. Our projects exceed 40 hours per project. |
Christmas Lights Unlimited |
|
ProMatcher |
Answer: 4 - 6 hours Explanation: Depending of how elaborated the client would like to have the lighting but typically about 4 hours to 6 Hours. |
House Stars Holiday Lighting Installation |
Answer: 2 - 4 hours Explanation: I only install exterior lights for design purposes. I do not carry a ladder for installation. |
Dragonfly Home Designs |
Answer: 1 - 2 hours Explanation: It really depends on the size of the house and the size of the job. But on an average house with a 2-man crew it shouldn't take more than 2 hours. |
Clearly Better Properties |
|
ProMatcher |
Answer: 6 - 8 hours Explanation: We decorate the interior of your home for Christmas including the tree, stair garlands and various decor. |
iDesign Interiors, LLC |
Answer: 1 - 2 hours Explanation: We are very good at what we do. No fooling around at the job site. |
J Co. Lawn Care |
Answer: 4 - 6 hours Explanation: they're all different |
Artios Painting 309 788 9432 |
|
ProMatcher |
Answer: 4 - 6 hours Explanation: A typical holiday decor installation ranges 4-6 hours. Of course we have 2 person crew installations of 2 hours and up to 15 person crew installations of several days |
Light Up My Holiday |
Answer: 2 - 4 hours Explanation: Depends on the square footage to be covered. |
Creative Re-Design & Décor, LLC (CRDD) |
Answer: 4 - 6 hours Explanation: Each job is varries for the time. |
Nightscenes and celebrations |
|
ProMatcher |
Answer: 4 - 6 hours Explanation: Custom lighting installations professionally installed for rental or permanent use can vary based on the venue or structure size and structure design. Tribal Existance Productions Worldwide |
Tribal Existance Productions Worldwide |
Answer: 6 - 8 hours Explanation: Every job is different |
Brady Innovations |
Answer: Not sure Explanation: We do not offer this service. |
LUXE Interiors |
|
ProMatcher |
Answer: 4 - 6 hours Explanation: On our typical projects it takes about 4-6 hours to finish an installation. |
The Christmas Guys |
Answer: 2 - 4 hours Explanation: Depends on job |
K&K Holiday lighting |
Answer: 4 - 6 hours Explanation: We do quality work ,that takes time . |
K&K Christmas lighting |
|
ProMatcher |
Answer: 2 - 4 hours Explanation: 200ft typically 3 hours. less for smaller property |
Vibrant Lighting |
Answer: 2 - 4 hours Explanation: It varies so much, on average it takes about 8-12 for a commercial job, and around 2-4 for a typical residential job. This is an average. |
Pristine Lighting |